Infrastructure projects depend on certainty. Surfacing must withstand extreme forces for years, subgrades must not fail and projects need to be completed smoothly. ROMFIX supplies systems designed for exactly these demands.
From heavily loaded driveways and central traffic islands to roundabouts, industrial estates and critical infrastructure sites, our foundation techniques, jointing mortars and drainage bedding mortars provide maximum stability, durability and peace of mind for your project.

We design complete systems rather than isolated products. Our solutions have been developed with engineering consultancies, extensively tested on demanding sites and repeatedly proven in practice.
At Gasunie valve sites, for example, paving must withstand extremely high axle loads for decades. In large-scale tests, with loads up to 20 tonnes and dynamic peaks up to 40 tonnes, paving constructed with ROMFIX remained completely stable, with no settlement, deformation or damage. This is the quality infrastructure professionals need to be able to rely on.
ROMFIX works closely with infrastructure and civil engineering contractors. We are not a paving contractor, but a technical knowledge partner who helps you get your project right from the foundations up. We can support you with:
Would you like to strengthen your team for the long term? We train your staff in the ROMFIX system so that they can work independently and without errors, following the guidelines. This increases capacity and safeguards quality.
Sustainability plays an increasingly important role in civil engineering. Our systems actively contribute through:
Our system also makes it possible to:
We are happy to help from the first sketch through to completion. Whether your project involves a heavily loaded driveway, industrial premises, a stretch of dyke or a complex urban site, ROMFIX provides the solution.
Browse the specification texts and technical specifications for our foundation systems. Contractors, landscapers and project planners can quickly check which materials and methods to use.
Important notice!
Due to rising diesel prices, the following applies from 16 March 2026: a fuel surcharge on deliveries. This surcharge applies only to goods delivered by ROMFIX. Collections remain exempt.
Questions? Please get in touch.
Holiday opening hours and deliveries
ROMFIX is closed from 18 December 2026 to 3 January 2027 inclusive.
Ordering online? The last day to place an order is Thursday 17 December. The last delivery day is Friday 18 December.
