The challenge for this project was to sustainably construct a temporary road that would remain stable over a long period on the peaty ground in Zunderdorp.
How could we stabilise this as sustainably as possible? This temporary road combines ROMFIX R’Tex, E’Grid and R’Cellen (the ROMFIX system), filled with a lightweight foundation aggregate. Our aim was to minimise ground disturbance and transport during both installation and removal of the temporary road.
FEREX lightweight access mats. Together with FEREX, we explored different ways to prevent excessive ground settlement in both the short and long term. FEREX access mats are made from glass-fibre-reinforced plastic, combining low weight with exceptional load-bearing capacity.

Important notice!
Due to rising diesel prices, the following applies from 16 March 2026: a fuel surcharge on deliveries. This surcharge applies only to goods delivered by ROMFIX. Collections remain exempt.
Questions? Please get in touch.
Holiday opening hours and deliveries
ROMFIX is closed from 18 December 2026 to 3 January 2027 inclusive.
Ordering online? The last day to place an order is Thursday 17 December. The last delivery day is Friday 18 December.