Together with Visser & Smit Hanab, we successfully constructed this valve arrangement on a stable base. Using the ROMFIX method, we were able to create a reliable structure on soft peat soil with a high groundwater level.
For this project, we used our own specially designed DCVG inspection chambers to optimise measurements of the cathodic protection of the underground pipelines. The challenge was the peat soil with poor load-bearing capacity and a high groundwater level. By using the ROMFIX system, we reduce the risk of settlement.